38 Years Journey

Since the last 38 years, Bygging has been innovating and supplying ingenious products - tank jacking equipment or tank lifting equipment, submerged arc automatic girth welding machines and jacks for erecting grain storage silos. Bygging provides a spectrum of solutions based on the needs and requirements of storage tank construction companies worldwide with the sole purpose of making the process of constructing a storage tank safer, faster and cost effective for the tank builder.


Bygging provides a spectrum of solutions based on the needs and requirements of storage tank construction companies worldwide including countries such as Qatar, Netherlands, Poland, Romania, UAE, Oman,Saudi Arabia, Algeria, Indonesia, Brazil, Denmark, Singapore, South Africa, Malaysia, Nigeria, Ghana, Finland & many more

Hydraulic tank lifting jacking equipment

Jacks that don’t need welding to tank shell

Jacks for tank base repair rebottoming

Jacks for tank base repair / rebottoming

Time and manpower comparison study

Submerged arc automatic girth welding AGW machines

Submerged arc automatic girth welding (AGW) machines

Telescopic jacks for grain storage silos and for bolted tanks

Telescopic jacks for grain storage silos and for bolted tanks

Strand jacks

Strand jacks

Bygging Jacking Equipment

Bygging Jacking Equipment Is Used For

Building of field erected storage tanks
Increase in tank capacity by adding shell rings or courses
Dismantling of old tanks
Repair or replacement of tank bottom plate
Repair to tank foundation

38 +
Years

Experience

89 +

Countries

1500 +
International

Projects

6000 +

Tanks

Want us to Get In Touch ?

why choose

Bygging Jacking System

Safety First
Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction,discarding the need for a tall boom crane.
No Scaffolding required
The jacking system dispenses with elaborate scaffolding requirements required to provide access for welding at heights, since now all welding is done at ground level.
Welding at ground level
Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is "LOW"
Lesser Manpower
Work at ground level increases productivity thereby reducing the number of manpower required.
Faster Erection
Welding inspectors can now conduct ultrasonic or other non-destructive tests on welds at ground level, facilitating ease of inspection and hence better quality control. Therefore, now there is no need to climb to precarious heights for welding inspection.
Easier Inspection
New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates.
Jacking used the world over
Global Presence
Bygging Infrastructure Pvt. Ltd. has constructed 5750 tanks in 55 Countries including United States, Libya, Egypt, Nigeria, Mexico, Brazil, Indonesia, Australia, Singapore and more in 320 locations.

Videos

Tank jacking video

Submerged arc automatic girth welding machine (AGW)

Jacking up of a grain storage silo

Jack climbs up like a monkey

SAW welding of a tank's horizontal joint

Magnetic rail for SAW girth welding machine

Bygging equipment has been used at these installations

  • Shell
  • Toatl
  • Exon Mobil
  • Chevron
  • Pertamina
  • BP
  • Petroleum Development Oman
  • Vopak
  • Oil Tanking
  • ONGC
  • Reliance Industries Limited
  • Bharat Petroleum
  • Indian Oil
  • Laica
  • QAFCO
  • Qatar Petroleum
  • Saudi Aramco
  • KNPC
  • CAIRN
  • Engro Corp
  • ENOC
  • Tank Med
  • GASCO
  • GPS Chemoil
  • Vedanta
  • Whessoe